5
- 32
5.6 Tests for CC-Link IE controller network Startup
5.6.2 Station-to-station test
5
PREPARATION AND SETUP
* 1 When the redundant system is in separate mode, power OFF and ON only system B or reset the
CPU module of system B.
* 2 When the redundant system is in separate mode,
1) Set the mode of system B to online mode, and write the data to the system B CPU.
2) Power OFF and ON only system B or reset the CPU module of system B.
3) Connect GX Developer to the control system CPU, and change the mode of the redundant
system to backup mode.
POINT
(1) When executing the station-to-station test, connect the cable properly
between OUT and IN.
Also, do not insert or remove a cable during test execution.
(Doing so will result in error completion.)
(2) The station-to-station test result can be confirmed with the link special relay
(SB0097). (
Содержание QJ71GP21-SX
Страница 1: ......
Страница 2: ......
Страница 644: ...App 94 Appendix 6 External Dimensions Appendix 6 2 QJ71GP21S SX APPENDICES Memo ...
Страница 649: ......
Страница 650: ......