5
PREPARATION AND SETUP
5.6 Tests for CC-Link IE controller network Startup
5.6.2 Station-to-station test
5
- 31
1
O
V
ER
VI
E
W
2
SYST
EM
CO
NF
IG
URA
T
IO
N
3
SPECI
F
IC
A
T
IO
N
S
4
F
UNCT
IONS
5
PREP
ARA
T
IO
N AND
SET
UP
6
P
A
RAM
E
T
E
R
SET
TI
NG
7
PRO
C
ESSI
NG
T
IM
E
8
PRO
G
R
AM
M
ING
(3) Executing the station-to-station test
Figure 5.38 Station-to-station test
Executing station
During test execution
End
End
Powering OFF and ON or resetting the CPU module
starts the test.
*1
The cable used in the station-to-station test is faulty.
Replace it.
Set it to online mode, and turn the power OFF and
ON or reset the CPU module.
*2
The MODE LED flashes, and the target station No.
turns ON.
Test completion (Failed)
The MODE LED flashes, and the target station No.
and ERR.LED turn ON.
Target station
During test execution
During station-to-station test execution, data link
stops on the executing and target stations. (Other
stations continue data link.)
While the executing station is in online mode, the
target station operates in online mode.
Powering OFF and ON or resetting the CPU module
activates the online mode.
The MODE LED flashes, and the executing station
No. turns ON.
1
2
4
8
1
2
4
8
1
RUN
SD
ERR.
PRM
D LINK
RD
MODE
Remains OFF
(Completed normally).
ON
After approx. 10 seconds,
is the D LINK LED ON?
RUN
SD
ERR.
PRM
D LINK
RD
1
1
2
4
8
1
2
4
8
MODE
RUN
SD
PRM
RD
1
1
2
4
8
1
2
4
8
D LINK
MODE
ERR.
X100 10
1
S
T.
N
O.
X100 10
1
S
T.
N
O.
X100 10
1
S
T.
N
O.
Содержание QJ71GP21-SX
Страница 1: ......
Страница 2: ......
Страница 644: ...App 94 Appendix 6 External Dimensions Appendix 6 2 QJ71GP21S SX APPENDICES Memo ...
Страница 649: ......
Страница 650: ......