5
PREPARATION AND SETUP
5.6 Tests for CC-Link IE controller network Startup
5.6.2 Station-to-station test
5
- 29
1
O
V
ER
VI
E
W
2
SYST
EM
CO
NF
IG
URA
T
IO
N
3
SPECI
F
IC
A
T
IO
N
S
4
F
UNCT
IONS
5
PREP
ARA
T
IO
N AND
SET
UP
6
P
A
RAM
E
T
E
R
SET
TI
NG
7
PRO
C
ESSI
NG
T
IM
E
8
PRO
G
R
AM
M
ING
(c) Setting network parameters in GX Developer
1) Set the mode of system A to online mode.
Set Network parameters in GX Developer as shown below.
2) Set the mode of system B (executing station) to station-to-station test mode.
In the Redundant settings window from Network parameters of GX Developer,
select Test between station for the mode of system B (executing station).
3) Connect GX Developer to the system B CPU and write the parameters to it.
Figure 5.35 Network parameters in GX Developer
Table 5.13 Network parameter setting items of GX Developer
Item
Set value
Network type
CC IE Control (Control station)
Starting I/O No.
0000
Network No.
1
Total stations
4
Group No.
0
Station No.
1
Mode
On line
Figure 5.36 Redundant settings of Network parameters in GX Developer
Содержание QJ71GP21-SX
Страница 1: ......
Страница 2: ......
Страница 644: ...App 94 Appendix 6 External Dimensions Appendix 6 2 QJ71GP21S SX APPENDICES Memo ...
Страница 649: ......
Страница 650: ......