5
PREPARATION AND SETUP
5.6 Tests for CC-Link IE controller network Startup
5
- 21
1
O
V
ER
VI
E
W
2
SYST
EM
CO
NF
IG
URA
T
IO
N
3
SPECI
F
IC
A
T
IO
N
S
4
F
UNCT
IONS
5
PREP
ARA
T
IO
N AND
SET
UP
6
P
A
RAM
E
T
E
R
SET
TI
NG
7
PRO
C
ESSI
NG
T
IM
E
8
PRO
G
R
AM
M
ING
5.6
Tests for CC-Link IE controller network Startup
This section describes the tests to be executed at startup of the CC-Link IE controller
network.
The tests check whether the network operates properly or not at system startup.
Perform each test according to the following.
Figure 5.24 Tests for CC-Link IE controller network startup
When completed normally
When failed
End
Test result?
Start
Configuring network system
Connect CC-Link IE controller network modules
with optical fiber cables.
Network is operating normally.
Power-on
Turn ON the external power supply. Check the
power supply module's POWER LED and the
CC-Link IE controller network module's RUN LED
are ON.
Circuit test
Checks the network cable connection status, line
status, and each station's parameter setting status
from the control station.
Station-to-station test
Checks the status of the cable connected between
2 stations (from OUT of executing station to IN of
target station).
When checking the cable
between faulty stations
By CC IE Control Network Diagnostics, check the
error detail and take corrective actions.
Содержание QJ71GP21-SX
Страница 1: ......
Страница 2: ......
Страница 644: ...App 94 Appendix 6 External Dimensions Appendix 6 2 QJ71GP21S SX APPENDICES Memo ...
Страница 649: ......
Страница 650: ......