5
PREPARATION AND SETUP
5.4 Testing the CC-Link IE controller network module
5.4.2 Self-loopback test
5
- 17
1
O
V
ER
VI
E
W
2
SYST
EM
CO
NF
IG
URA
T
IO
N
3
SPECI
F
IC
A
T
IO
N
S
4
F
UNCT
IONS
5
PREP
ARA
T
IO
N AND
SET
UP
6
P
A
RAM
E
T
E
R
SET
TI
NG
7
PRO
C
ESSI
NG
T
IM
E
8
PRO
G
R
AM
M
ING
(3) Executing the self-loopback test
Figure 5.20 Self-loopback test
Start
During test execution
RUN
SD
ERR.
PRM
D LINK
RD
X100
X100
X100
10
1
2
4
8
1
MODE
Test completion
When completed normally
RUN
SD
ERR.
PRM
RD
10
1
2
4
8
1
D LINK
MODE
When failed
RUN
SD
PRM
RD
10
1
2
4
8
1
D LINK
MODE
ERR.
1
2
4
8
1
1
2
4
8
1
1
2
4
8
1
When completed normally
When failed
End
*2
Powering OFF and ON or resetting the CPU
module starts the test.
*1
The MODE LED flashes, and each of the 10 LEDs
turns ON and OFF in order (1 2 4 8 1 ).
Note that, upon detection of an error, the test is
immediately terminated (error completion).
The MODE LED flashes, and 1, 2, 4 and 8 10
LEDs turn OFF.
The MODE LED flashes, and the ERR.LED and
any one of 1, 2, 4 and 8 10 LEDs turn ON.
The D LINK LED turns ON.
Test result?
S
T.
N
O.
S
T.
N
O.
S
T.
N
O.
Replace the optical fiber cable and execute the test again.
If it fails again, the CC-Link IE controller network module hardware
may be faulty. Please consult your local Mitsubishi representative,
explaining a detailed description of the problem.
Содержание QJ71GP21-SX
Страница 1: ......
Страница 2: ......
Страница 644: ...App 94 Appendix 6 External Dimensions Appendix 6 2 QJ71GP21S SX APPENDICES Memo ...
Страница 649: ......
Страница 650: ......