5
PREPARATION AND SETUP
5.4 Testing the CC-Link IE controller network module
5
- 7
1
O
V
ER
VI
E
W
2
SYST
EM
CO
NF
IG
URA
T
IO
N
3
SPECI
F
IC
A
T
IO
N
S
4
F
UNCT
IONS
5
PREP
ARA
T
IO
N AND
SET
UP
6
P
A
RAM
E
T
E
R
SET
TI
NG
7
PRO
C
ESSI
NG
T
IM
E
8
PRO
G
R
AM
M
ING
5.4
Testing the CC-Link IE controller network module
This section describes the tests of the CC-Link IE controller network module.
Before starting up the system, the test is to be performed to check the CC-Link IE
controller network module and cables.
Perform each test according to the following.
Figure 5.6 Procedures for testing the CC-Link IE controller network module
Connect wires to the external power supply terminal
block of the CC-Link IE controller network module.
Turning OFF external power (24V DC)
Turn OFF the external power (24V DC).
1)
Turn ON the external power (24V DC).
Wiring
Applying external power (24V DC)
Check the external power voltage of the CC-Link IE
controller network module is within the specified range.
Before applying external power (24V DC)
Mount the CPU module, power supply module,
CC-Link IE controller network module, etc. to the base
unit.
Mounting modules
Start
Is it CC-Link IE controller
network module with external
power supply function?
No
Yes
ON
OFF
Is the EXT.PW LED on
the CC-Link IE controller network
module ON?
The CC-Link IE controller network module hardware
may be faulty. Please consult your local Mitsubishi
representative, explaining a detailed description of the
problem.
Содержание QJ71GP21-SX
Страница 1: ......
Страница 2: ......
Страница 644: ...App 94 Appendix 6 External Dimensions Appendix 6 2 QJ71GP21S SX APPENDICES Memo ...
Страница 649: ......
Страница 650: ......