2
Installa
tion
2-23
12
Temporarily secure the robot to the base by tightening the bolts.
NOTE
• For details about tightening torque to secure the robot firmly, see "2.4 Installing the robot".
• When installing the robot, the positioning pins can be used. For details about positions and dimensions, see "1.2 External view and
dimensions" in Chapter 8.
13
Remove the ropes, eyebolts, washers, and arm clamp stay.
14
Remove the X-axis mechanical stoppers.
Remove the X-axis mechanical stoppers that have been installed in Step 6.
15
Screw the bolts into the eyebolt clamp holes and mechanical stopper clamp holes.
NOTE
Always attach these bolts to protect the tapped holes.
Be sure to keep the eyebolts, arm clamp stay, bolts, and pallet since they may be used to move the robot again.
Summary of Contents for R6YXG500
Page 1: ...ZX T Series Cat No I155E EN 03A R6Y XG series INSTALLATION MANUAL SCARA Robots XG Series...
Page 2: ......
Page 10: ......
Page 36: ......
Page 38: ......
Page 40: ......
Page 46: ......
Page 48: ......
Page 56: ......
Page 174: ......
Page 176: ......
Page 220: ......
Page 221: ...Chapter 4 Periodic inspection Contents 1 Overview 4 1 2 List of inspection items 4 2...
Page 222: ......
Page 226: ......
Page 227: ...Chapter 5 Harmonic drive replacement period Contents 1 Overview 5 1 2 Replacement period 5 2...
Page 228: ......
Page 232: ......
Page 238: ......
Page 240: ......
Page 244: ......
Page 246: ......
Page 323: ...8 Specifications 8 77 1 3 Robot inner wiring diagram Robot inner wiring diagram R6YXG500...