3.2 Basic Operating Procedure
────────────────────────────────────────────────────
測定対象のラインが遮断されていることを確認、
および本器の電源が
OFF
され電源コードを抜いて
あることを確認する
Check that the line to be measured is shut off, and
check that this unit is powered off and the power
cord disconnected from the outlet.
Turn the power on.
Set the connection mode.
Set the display item.
Set the measurement range.
Start the measurement.
Set the each items.
Check the connection of line being measured again,
and turn on the power line.
Make a connections.
Turn the power on.
Check there is no short circuit
(Warming-up 1 hour or more
When using the 9600 or 9602,
carry out degaussing after warming-up.)
See Section 3.4, 3.5.
Turn the power on.
Connect the power cord to the 3P-outlet.
3.2 Basic Operating Procedure
Summary of Contents for Power HiTester 3193
Page 2: ......
Page 50: ...32 3 9 Operations During Power Failure ...
Page 76: ...58 4 13 Degaussing ...
Page 80: ...62 5 2 Setting the Frequency Range fa ...
Page 108: ...90 9 3 Internal Circuit for the External Control and Timing ...
Page 112: ...94 10 3 Output Rate ...
Page 250: ...232 13 9 Error and Overflow Displays ...
Page 278: ...260 17 5 Internal Block Diagram ...
Page 284: ...266 19 2 Installation Procedures For JIS standard For EIA standard External Dimensions ...
Page 300: ...282 20 4 Internal Block Diagram of the 3193 ...
Page 306: ...INDEX 4 Index ...
Page 307: ......
Page 308: ......
Page 309: ......
Page 310: ......