74
────────────────────────────────────────────────────
7.5 Manual Integration (Controlled by Panel Keys)
────────────────────────────────────────────────────
Start
Reset
Integration
display value
Time
Stop
Hold
Start
Start
Integration
display value
Stop
Hold
Integration value
Integration value
Add
Time
START
/STOP
SHIFT
START
/STOP
START
/STOP
START
/STOP
START
/STOP
START
/STOP
NOTE
7.5 Manual Integration
(Controlled by Panel Keys)
Manual integration continues from the time that integration is started until
any later point when it is stopped.
1. Select the channel and item to be
integrated.
2. If an interval, timer, or real-time control
time is set, switch it off.
See section 7.2, "Setting the Control
Time."
3. Press the
START/STOP
key to start
integration. "INTEG" (yellow) is
indicated.
4. After the required time has elapsed,
press the
START/STOP
key to end the
integration. "INTEG" (blue) is
indicated.
5. To continue with cumulative
integration, press the
START/STOP
key
again. "INTEG" (yellow) is indicated.
6. To reset the integration value, press the
SHIFT
key and then
START/STOP
key
"INTEG" goes off.
・
If an interval, timer, or real-time control time is set, manual integration is
not possible.
・
Because of the internal circuit design, the maximum integration time is
10,000 hours.
・
If the FDD output or printer output is set, these operate when the
START/STOP
key is pressed. If not necessary, set to
"OFF"
.
・
While the hold function is activated, the display is frozen, but internally the
integration continues normally. When the floppy disk drive, printer, or D/A
outputs are used, however, the held values continue to be output.
Summary of Contents for Power HiTester 3193
Page 2: ......
Page 50: ...32 3 9 Operations During Power Failure ...
Page 76: ...58 4 13 Degaussing ...
Page 80: ...62 5 2 Setting the Frequency Range fa ...
Page 108: ...90 9 3 Internal Circuit for the External Control and Timing ...
Page 112: ...94 10 3 Output Rate ...
Page 250: ...232 13 9 Error and Overflow Displays ...
Page 278: ...260 17 5 Internal Block Diagram ...
Page 284: ...266 19 2 Installation Procedures For JIS standard For EIA standard External Dimensions ...
Page 300: ...282 20 4 Internal Block Diagram of the 3193 ...
Page 306: ...INDEX 4 Index ...
Page 307: ......
Page 308: ......
Page 309: ......
Page 310: ......