Failure and replacement of components during operation
16.3 Failure and replacement of components of the distributed I/Os
S7-400H
System Manual, 03/2012, A5E00267695-11
279
Replacement procedure
Proceed as follows to replace PROFIBUS DP cables:
Step
What has to be done?
How does the system react?
1
Check the cabling and localize the
interrupted PROFIBUS DP cable.
–
2
Replace the defective cable.
–
3
Switch the failed modules to RUN
mode.
The CPUs process the error OBs synchronized
with each other
With one-sided I/O:
Rack failure OB 86 (outgoing event)
The DP slaves can be addressed via the
DP master system.
With switched I/O:
I/O redundancy error OB 70 (outgoing
event).
The DP slaves can be addressed via both
DP master systems.
Содержание SIMATIC S7-400H
Страница 24: ...Preface 1 1 Preface S7 400H 24 System Manual 03 2012 A5E00267695 11 ...
Страница 46: ...Getting Started 4 5 Special layout features of SIMATIC Manager S7 400H 46 System Manual 03 2012 A5E00267695 11 ...
Страница 120: ...Memory concept 10 1 Overview of the memory concept of S7 400H CPUs S7 400H 120 System Manual 03 2012 A5E00267695 11 ...
Страница 258: ...Communication 14 8 General issues regarding communication S7 400H 258 System Manual 03 2012 A5E00267695 11 ...
Страница 354: ...Synchronization modules 18 3 Selecting fiber optic cables S7 400H 354 System Manual 03 2012 A5E00267695 11 ...
Страница 434: ...Technical data 20 6 Runtimes of the FCs and FBs for redundant I Os S7 400H 434 System Manual 03 2012 A5E00267695 11 ...
Страница 460: ...Function modules and communication processors supported by the S7 400H S7 400H 460 System Manual 03 2012 A5E00267695 11 ...