Communication
14.1 Communication services
S7-400H
230
System Manual, 03/2012, A5E00267695-11
Options for closing the communication connection
The following events cause the communication connection to be closed:
●
Program cancellation of the communication connection with FB 66 "TDISCON".
●
The CPU state changes from RUN to STOP.
●
At POWER OFF / POWER ON
Connection diagnostics
In Step7, you can read detailed information on the configured connections by selecting
"Module state -> Communication -> Open communication over Industrial Ethernet".
Reference
For detailed information on the blocks described above, refer to the
STEP 7 Online Help.
Содержание SIMATIC S7-400H
Страница 24: ...Preface 1 1 Preface S7 400H 24 System Manual 03 2012 A5E00267695 11 ...
Страница 46: ...Getting Started 4 5 Special layout features of SIMATIC Manager S7 400H 46 System Manual 03 2012 A5E00267695 11 ...
Страница 120: ...Memory concept 10 1 Overview of the memory concept of S7 400H CPUs S7 400H 120 System Manual 03 2012 A5E00267695 11 ...
Страница 258: ...Communication 14 8 General issues regarding communication S7 400H 258 System Manual 03 2012 A5E00267695 11 ...
Страница 354: ...Synchronization modules 18 3 Selecting fiber optic cables S7 400H 354 System Manual 03 2012 A5E00267695 11 ...
Страница 434: ...Technical data 20 6 Runtimes of the FCs and FBs for redundant I Os S7 400H 434 System Manual 03 2012 A5E00267695 11 ...
Страница 460: ...Function modules and communication processors supported by the S7 400H S7 400H 460 System Manual 03 2012 A5E00267695 11 ...