Link-up and update
12.4 Time monitoring
S7-400H
System Manual, 03/2012, A5E00267695-11
155
12.4
Time monitoring
Program execution is interrupted for a certain time during updating. This section is relevant
to you if this period is critical in your process. If this is the case, configure one of the
monitoring times described below.
During updating, the fault-tolerant system monitors the cycle time extension, communication
delay and inhibit time for priority classes > 15 in order to ensure that their configured
maximum values are not exceeded, and that the configured minimum I/O retention time is
maintained.
NOTICE
If you have not defined any default values for the monitoring times, make allowance for the
update in the scan cycle monitoring time. If in this case the update is cancelled, the fault-
tolerant system switches to standalone mode: The previous master CPU remains in RUN,
and the standby CPU goes into STOP.
You can either configure all the monitoring times or none at all.
You made allowances for the technological requirements in your configuration of monitoring
times.
The monitoring times are described in detail below.
●
Maximum cycle time extension
–
Cycle time extension: The time during the update in which neither OB 1 nor any other
OBs up to priority class 15 are executed. "Normal" cycle time monitoring is disabled
within this time span.
–
Max. cycle time extension: The maximum permissible cycle time extension configured
by the user.
●
Maximum communication delay
–
Communication delay: The time span during the update during which no
communication functions are processed. Note: The master CPU, however, maintains
all existing communication links.
–
Maximum communication delay: The maximum permissible communication delay
configured by the user.
Содержание SIMATIC S7-400H
Страница 24: ...Preface 1 1 Preface S7 400H 24 System Manual 03 2012 A5E00267695 11 ...
Страница 46: ...Getting Started 4 5 Special layout features of SIMATIC Manager S7 400H 46 System Manual 03 2012 A5E00267695 11 ...
Страница 120: ...Memory concept 10 1 Overview of the memory concept of S7 400H CPUs S7 400H 120 System Manual 03 2012 A5E00267695 11 ...
Страница 258: ...Communication 14 8 General issues regarding communication S7 400H 258 System Manual 03 2012 A5E00267695 11 ...
Страница 354: ...Synchronization modules 18 3 Selecting fiber optic cables S7 400H 354 System Manual 03 2012 A5E00267695 11 ...
Страница 434: ...Technical data 20 6 Runtimes of the FCs and FBs for redundant I Os S7 400H 434 System Manual 03 2012 A5E00267695 11 ...
Страница 460: ...Function modules and communication processors supported by the S7 400H S7 400H 460 System Manual 03 2012 A5E00267695 11 ...