1.4
Mounting The Expansion Common Equipment Cabinet
1. Unpack and carefully inspect all equipment for shipping damage. Notify the shipper immediately of any
damages found. Verify that the packages contain all parts and accessories needed for proper installation and
operation.
2. Expansion cabinet one mounts above the main cabinet and expansion cabinet two mounts below the main
cabinet. After you determine where you will mount the expansion cabinet, remove the plates covering the
appropriate interface cable access holes on the main and expansion cabinets. As you face the front of the
cabinets, these plates are located near the left front of the cabinet’s top and bottom.
3. The illustration shows the locating dimensions required for the expansion cabinet’s mounting screws. Mark
the hardware locations on the backboard either above or below the main common equipment cabinet
depending upon where you intend to mount the cabinet. (You must mount the cabinet vertically on the
backboard.)
4. Drill holes in the backboard of a proper size to accommodate the hardware being used.
5. Insert the two top screws into the backboard and tighten them to within approximately 1/8-inch of the surface.
6. Hang the cabinet on the top screws using the top mounting holes in the rear mounting flange of the cabinet.
Note that these holes are elongated with an enlargement at one end. This feature allows the cabinet to slide
down on the screws to secure the mounting when the cabinet is hung on them.
7. Use the openings for the middle and lower set of mounting screws as a guide, and mark the location for the
remaining screws.
8. Lift the cabinet from the top screws and set it aside while preparing the holes for the remaining screws.
9. Rehang the cabinet as discussed in step 6.
10. Insert the middle and lower screws into the backboard and tighten them to within approximately 1/8-inch of
the surface.
11. Shipping screws attach the front panel to the main cabinet. These screws are in addition to the two retaining
screws located at the lower corners of the panel. Remove and store the shipping screws. You will not need
them to re-attach the panel to the cabinet after you have installed the power supply assembly, circuit boards,
and wiring; however, you will need them to secure the panel in place if you should later transport the cabinet
to a new location.
12. After you remove the shipping and retaining screws, pivot the front panel upward until you can unhook the
panel hangers from the slots in the cabinet top. To re-attach the front panel, pivot it upward so that you can
hook the panel hangers into the slots at the top of the cabinet, and then pivot the panel down in place. Install
the two retaining screws at the bottom right-hand and left-hand corners of the panel to secure it to the cabinet.
IMI66–106
Installing The DXP Plus Expansion Cabinet
2 – Installing The DXP Plus Expansion Cabinet
Содержание DXP Plus Series
Страница 1: ...Digital Communications System R ...
Страница 363: ...Automatic Call Distributor Technical Manual R QuickQ DXP ...
Страница 424: ...Automatic Call Distributor System Manager s Guide R QuickQ DXP ...
Страница 500: ...Wrap up Time 1 6 Wrapping Up A Call 4 3 Z Zoom Box A 2 GCA70 271 Index I 3 ...
Страница 628: ...Interconnecting The VMI X Installing And Programming For ExecuMail IMI89 206 Installing And Programming For ExecuMail 5 ...
Страница 677: ...Connecting The Equipment Installing And Programming The OPX X IMI89 209 Installing The OPX X 7 ...
Страница 728: ...DP I I I I and FX Series Digital Communications Systems Understanding The Visual Man Machine Interface COMDlA ...
Страница 1112: ...9 08 8 90 1 13 4 78 3 94 UNIS029 TAB003 PLS page 6 GCA40 130 DXP Plus General Description 11B Telephone Features ...