3.3
Installing The Services Boards In The Equipment Cabinet
1. Be sure that the AC power cord is not connected to an AC outlet and that the cable from the optional battery
back-up assembly is not connected to the main cabinet power supply.
2. Install your static discharge wrist strap on your bare wrist; adjust it for a snug fit. Be sure that the strap is
touching bare skin and is not isolated by clothing. Connect the wrist strap cord between the wrist strap and an
AC or earth ground
NOTE: With the common equipment in the installed position, the ground lug on the side of the cabinet is an
appropriate grounding point since it should have a heavy ground wire connected between it and a good
earth ground.
3. When you are ready to install the circuit board, remove it from its static protection bag.
4. Locate the proper board slot. Remember, the service board plugs into into a unique slot.
5. Orient the circuit board with its top and bottom guides in main cabinet board cage. and press the board firmly
until its board edge connection properly mates with the connector on cabinet’s backplane.
CAUTION
When pressing circuit boards into place, press them only at the extractor lever locations. If you apply
pressure at other locations you may damage the board assembly.
6. Repeat steps 3 and 4 until all circuit boards are installed.
7. Make a final inspection to ensure that all circuit boards are, oriented correctly and mated properly.
8. Install and tighten the supplied screws to secure the circuit boards to the board cage.
IMI66–105
Installing The DXP Plus Main Cabinet
14 – Installing The DXP Plus Main Cabinet
Содержание DXP Plus Series
Страница 1: ...Digital Communications System R ...
Страница 363: ...Automatic Call Distributor Technical Manual R QuickQ DXP ...
Страница 424: ...Automatic Call Distributor System Manager s Guide R QuickQ DXP ...
Страница 500: ...Wrap up Time 1 6 Wrapping Up A Call 4 3 Z Zoom Box A 2 GCA70 271 Index I 3 ...
Страница 628: ...Interconnecting The VMI X Installing And Programming For ExecuMail IMI89 206 Installing And Programming For ExecuMail 5 ...
Страница 677: ...Connecting The Equipment Installing And Programming The OPX X IMI89 209 Installing The OPX X 7 ...
Страница 728: ...DP I I I I and FX Series Digital Communications Systems Understanding The Visual Man Machine Interface COMDlA ...
Страница 1112: ...9 08 8 90 1 13 4 78 3 94 UNIS029 TAB003 PLS page 6 GCA40 130 DXP Plus General Description 11B Telephone Features ...