When phase-to-ground voltage measurement is selected the function
automatically introduces division of the base value by the square root of three.
9.1.7.1
Measurement principle
M15326-6 v6
Depending on the set
ConnType value, UV2PTUV (27) measures phase-to-ground or phase-to-
phase voltages and compare against set values,
Pickup1 and Pickup2. The parameters OpMode1
and
OpMode2 influence the requirements to activate the PICKUP outputs. Either 1 out of 3, 2 out
of 3, or 3 out of 3 measured voltages have to be lower than the corresponding set point to issue
the corresponding PICKUP signal.
To avoid oscillations of the output PICKUP signal, a hysteresis has been included.
9.1.7.2
Time delay
M15326-10 v12
The time delay for the two steps can be either definite time delay (DT) or inverse time
undervoltage (TUV). For the inverse time delay three different modes are available:
•
inverse curve A
•
inverse curve B
•
customer programmable inverse curve
The type A curve is described as:
TD
t
Vpickup
V
Vpickup
=
< -
<
ANSIEQUATION1431 V1 EN-US
(Equation 170)
where:
Vpickup<
Set value for step 1 and step 2
V
Measured voltage
The type B curve is described as:
2.0
480
0.055
Vpickup < -V
32
0.5
Vpickup
TD
t
×
=
+
×
-
<
æ
ö
ç
÷
è
ø
EQUATION1608 V1 EN-US
(Equation 171)
The customer programmable curve can be created as:
Section 9
1MRK 502 066-UUS B
Voltage protection
604
Technical manual
Summary of Contents for Relion 670 series
Page 1: ... RELION 670 SERIES Generator protection REG670 Version 2 1 ANSI Technical manual ...
Page 2: ......
Page 48: ...42 ...
Page 62: ...56 ...
Page 182: ...176 ...
Page 692: ...686 ...
Page 726: ...720 ...
Page 1014: ...1008 ...
Page 1242: ...1236 ...
Page 1362: ...1356 ...
Page 1386: ...1380 ...
Page 1422: ...1416 ...
Page 1431: ...1425 ...