7U
DQ
VI
RU
P
HU
0RXQWLQJSODWH
)RXQGDWLRQ
)RXQGDWLRQ
(TXLSRWHQWLDOERQGLQJ
)XVHVVZLWFKHVDQG
FRQWDFWRUV
/LQHILOWHU
,QYHUWHU
2XWSXWUHDFWRURU
VLQHZDYHILOWHU
&RQWUROFDELQHW
&RQWUROFDELQHW
'ULYHQPDFKLQH
6KLHOGVXSSRUW
(OHFWULFDOO\
FRQGXFWLYH
FRQQHFWLRQV
WKURXJKDODUJH
VXUIDFHDUHD
3(
3(
3(
3(
/
1
/
/
Figure 3-3
Grounding and high-frequency equipotential bonding measures in the control cabinet and
in the plant/system
Further information
Additional information about EMC-compliant installation is available in the Internet:
EMC installation guideline (
http://support.automation.siemens.com/WW/view/en/
)
3.2.2
Cables
Cables with a high level of interference and cables with a low level of interference are
connected to the converter:
● Cables with a high level of interference:
– Cable between the line filter and converter
– Motor cable
– Cable at the converter DC link connection
● Cables with a low level of interference:
– Cable between the line and line filter
– Signal and data cables
Mounting
3.2 EMC-compliant setup of the machine or plant
SINAMICS G120X converter
54
Operating Instructions, 06/2019, FW V1.01, A5E44751209B AC
Содержание SINAMICS G120X
Страница 2: ......
Страница 152: ...Wiring 4 2 Control interfaces SINAMICS G120X converter 150 Operating Instructions 06 2019 FW V1 01 A5E44751209B AC ...
Страница 940: ...Parameters 7 3 ASCII table SINAMICS G120X converter 938 Operating Instructions 06 2019 FW V1 01 A5E44751209B AC ...
Страница 1114: ...Appendix A 1 Manuals and technical support SINAMICS G120X converter 1112 Operating Instructions 06 2019 FW V1 01 A5E44751209B AC ...
Страница 1147: ......