5.4.3
Start quick commissioning and select the application class
Starting quick commissioning
Requirements
● The power supply is switched on.
● The operator panel displays setpoints and actual values.
Procedure
Press the ESC key.
Press one of the arrow keys until the BOP-2 displays the "SETUP" menu.
To start quick commissioning, in the "SETUP" menu, press the OK key.
We recommend resetting the converter to the factory setting before commencing quick
commissioning.
Should you wish to change the default setting of the interfaces, the converter must be reset to
the factory settings now.
Proceed as follows:
1. Press the OK key.
2. Switchover the display using an arrow key: nO → YES
3. Press the OK key.
When selecting an application class, the converter assigns the motor control with the
appropriate default settings:
●
Standard Drive Control (Page 163)
●
Dynamic Drive Control (Page 165)
●
Depending on the particular Power Module, the converter skips selecting the application
class. If the BOP-2 does not display step DRV APPL, then continue commissioning as
described under "Expert".
63
6(783
5(6(7
3
'59$33/
Commissioning
5.4 Quick commissioning using the BOP-2 operator panel
SINAMICS G120X converter
Operating Instructions, 06/2019, FW V1.01, A5E44751209B AC
161
Содержание SINAMICS G120X
Страница 2: ......
Страница 152: ...Wiring 4 2 Control interfaces SINAMICS G120X converter 150 Operating Instructions 06 2019 FW V1 01 A5E44751209B AC ...
Страница 940: ...Parameters 7 3 ASCII table SINAMICS G120X converter 938 Operating Instructions 06 2019 FW V1 01 A5E44751209B AC ...
Страница 1114: ...Appendix A 1 Manuals and technical support SINAMICS G120X converter 1112 Operating Instructions 06 2019 FW V1 01 A5E44751209B AC ...
Страница 1147: ......