Procedure for FSH and FSJ
1. Set p0010 = 2.
2. Set the forming duration p3380.
Storage time from the production date
Recommended forming duration
1 ... 2 years
1 hour
2 ... 3 years
2 hours
> 3 years
8 hours
For p3380 > 0, with alarm A07391, the converter signals that at the next ON command, DC
link forming starts.
3. Switch on the motor, e.g. from an inserted operator panel.
4. Wait for the forming time to elapse. r3381 indicates the remaining time.
If the line voltage is switched off before forming has been completed, then you have to form
the DC link again.
5. The converter sets p3380 = 0.
6. Set p0010 = 0.
You have formed the DC link.
❒
Parameter
Parameter
Description
Factory setting
p0010
Drive commissioning parameter filter
0
p3380
Forming activation/duration
0 h
r3381
Remaining forming time
- h
r3382
Forming status word
-
Commissioning
5.3 Preparing for commissioning
SINAMICS G120X converter
156
Operating Instructions, 06/2019, FW V1.01, A5E44751209B AC
Содержание SINAMICS G120X
Страница 2: ......
Страница 152: ...Wiring 4 2 Control interfaces SINAMICS G120X converter 150 Operating Instructions 06 2019 FW V1 01 A5E44751209B AC ...
Страница 940: ...Parameters 7 3 ASCII table SINAMICS G120X converter 938 Operating Instructions 06 2019 FW V1 01 A5E44751209B AC ...
Страница 1114: ...Appendix A 1 Manuals and technical support SINAMICS G120X converter 1112 Operating Instructions 06 2019 FW V1 01 A5E44751209B AC ...
Страница 1147: ......