Revision June 2010
1-1
Chapter 1 Unpacking Check and Model Explanation
1.1 Unpacking
Check
After receiving the AC servo drive, please check for the following:
Ensure that the product is what you have ordered.
Verify the part number indicated on the nameplate corresponds with the part number of
your order (Please refer to Section 1.2 for details about the model explanation).
Ensure that the servo motor shaft rotates freely.
Rotate the motor shaft by hand; a smooth rotation will indicate a good motor. However, a
servo motor with an electromagnetic brake can not be rotated manually.
Check for damage.
Inspect the unit to insure it was not damaged during shipment.
Check for loose screws.
Ensure that all necessary screws are tight and secure.
If any items are damaged or incorrect, please inform the distributor whom you purchased the
product from or your local Delta sales representative.
A complete and workable AC servo system should include the following parts:
Part I : Delta standard supplied parts
(1) Servo
drive
(2)
Servo motor
(3)
5 PIN Terminal Block (for L1c, L2c, R, S, T)
(4)
3 PIN Terminal Block (for U, V, W)
(5)
4 PIN Terminal Block (for P , D, C, )
(6)
One operating lever (for wire to terminal block insertion)
(7)
One jumper bar (installed at pins P and D of the 3 PIN Terminal Block for P , D, C)
(8)
Instruction Sheets
Part II : Optional parts (Refer to Appendix A)
(1)
One power cable, which is used to connect servo motor to U, V, W terminals of servo
drive. This power cable includes a green grounding cable. Please connect the green
grounding cable to the ground terminal of the servo drive.
Summary of Contents for ASD-B2-0121-B
Page 1: ......
Page 13: ...Table of Contents xii Revision June 2010 This page intentionally left blank...
Page 17: ...Chapter 1 Unpacking Check and Model Explanation 1 4 Revision June 2010 ECMA Series Servo Motor...
Page 87: ...Chapter 4 Display and Operation 4 12 Revision June 2010 This page intentionally left blank...
Page 131: ...Chapter 6 Control Modes of Operation 6 22 Revision June 2010 Time Domain...
Page 267: ...Chapter 8 MODBUS Communications 8 18 Revision June 2010 This page intentionally left blank...
Page 271: ...Chapter 9 Maintenance and Inspection 9 4 Revision June 2010 This page intentionally left blank...
Page 291: ...Chapter 11 Specifications 11 8 Revision June 2010 11 3 Servo Motor Speed Torque Curves...