Data Manager Procedures
306
CEQ™ 8000 Genetic Analysis System
When a folder is deleted, all of the data contained within that folder
will be deleted. You will be warned by the system.
Renaming a Project Folder or Database
To rename an existing folder, perform the following steps.
1. In the Data Manager window, highlight the project folder or database.
2. Select
File | Rename
from the menu bar.
3. Enter the new name for the database and press the
Enter
key.
Database Size
The database size is displayed in the Database Manager. To view the database size,
mouse-click the CEQ DBASE item at the top of the left pane (see Figure 170). The
size for each database is shown in the right pane.
If data has recently been removed from a database, the size shown may not
be accurate. Refer to “Shrink Database” below for more information.
Figure 167:Data Manager
CAUTION
Summary of Contents for CEQ 8000
Page 42: ...Program Description 28 CEQ 8000 Genetic Analysis System...
Page 98: ...84 CEQ 8000 Genetic Analysis System...
Page 110: ...96 CEQ 8000 Genetic Analysis System...
Page 120: ...106 CEQ 8000 Genetic Analysis System...
Page 128: ...114 CEQ 8000 Genetic Analysis System...
Page 152: ...138 CEQ 8000 Genetic Analysis System Figure 80 Report Format dialog...
Page 154: ...140 CEQ 8000 Genetic Analysis System...
Page 162: ...Run Procedures 148 CEQ 8000 Genetic Analysis System...
Page 220: ...Sequence Analysis Procedures 206 CEQ 8000 Genetic Analysis System...
Page 318: ...Fragment Analysis Procedures 304 CEQ 8000 Genetic Analysis System...
Page 329: ...Exporting Database Items User s Guide 315 Figure 180...
Page 364: ...Direct Control and Replenishment 350 CEQ 8000 Genetic Analysis System...
Page 380: ...Routine Maintenance 366 CEQ 8000 Genetic Analysis System...