Chapter 7
Replacing the Septum
Maintaining a Packed Column Injector
Maintenance and Troubleshooting Manual
125
OPERATING SEQUENCE
Replacing the Septum
Materials needed
•
Non metallic sharp tool
•
Septum (see # 7, Table 7-1 on
)
•
Tweezers
CAUTION
This operation must be carried out at low temperature to avoid burns. Therefore,
before beginning the sequence, the injector must be cooled to room temperature.
PRECAUTIONS
1. While in stand-by condition, press
OVEN
to
access the oven control table.
.
OVEN
Temp
80
80 <
Initial time
20
Ramp 1
Off
2. Scroll to
Temp
and press
OFF
.
3. Press
LEFT INLET
or
RIGHT INLET
depending on
which injector is operating. In the following
example, a PKD injector installed on the right
channel is considered.
RIGHT INLET (PKD)
Temp
180
180 <
Pressure
100
100
4. Scroll to
Temp
and press
OFF
.
Содержание TRACE GC Ultra
Страница 4: ......
Страница 10: ...x Maintenance and Troubleshooting Manual Contents ...
Страница 20: ......
Страница 128: ......
Страница 178: ...Chapter 9 Maintaining a PTV Injector PTV Troubleshooting 178 Maintenance and Troubleshooting Manual ...
Страница 218: ......
Страница 268: ......
Страница 314: ......