Chapter 15
Maintaining a Photoionization Detector
Replace the UV Lamp
322
Maintenance and Troubleshooting Manual
7. Insert the lamp holder into the lamp housing
8. Tighten the two knurled screws to fix the lamp
holder to its housing.
9. In the
RIGHT DETECTOR (PID)
control table
scroll subsequently to
Mkup
,
Sheath Gas
and
Lamp
and press
ON
.
CAUTION
Before starting a new analysis
wait about 30 minutes so the
lamp output can stabilize.
Содержание TRACE GC Ultra
Страница 4: ......
Страница 10: ...x Maintenance and Troubleshooting Manual Contents ...
Страница 20: ......
Страница 128: ......
Страница 178: ...Chapter 9 Maintaining a PTV Injector PTV Troubleshooting 178 Maintenance and Troubleshooting Manual ...
Страница 218: ......
Страница 268: ......
Страница 314: ......