Chapter 2
Replace the Split Line Tubing
Maintaining a Split/Splitless Injector
Maintenance and Troubleshooting Manual
51
11. Connect the new split line tubing to the injector
body.
a. On the end of the new split line tubing
having the greater diameter, slide the 5/16”
brass nut and the brass front/back ferrule.
b. Fully insert the tubing into the fitting on the
injector body and rotate the nut finger-tight.
c. Mark the nut at the 12 o’clock position.
d. While holding the fitting body steady,
tighten the nut tree-quarters turn to the 9
o’clock position.
12. Connect the new split line tubing to the split
line filter
a. On the end of the new split line tubing
having the lower diameter, slide the nut
6MB nut and the 1.6 mm ID brass ferrule.
b. Insert the tubing into the outlet of the split
line filter.
c. Finger-tighten the 6 MB nut until it start to
grip the filter.
d. Use two 8-10 mm wrench to tighten the nut.
Use no more pressure than is necessary to
obtain a good seal.
13. Press
LEFT CARRIER
or
RIGHT CARRIER,
depending on which injector is operating, scroll
to
Pressure
and press
ON
.
14. Press
OVEN
, scroll to
Temp
and press
ON
.
Содержание TRACE GC Ultra
Страница 4: ......
Страница 10: ...x Maintenance and Troubleshooting Manual Contents ...
Страница 20: ......
Страница 128: ......
Страница 178: ...Chapter 9 Maintaining a PTV Injector PTV Troubleshooting 178 Maintenance and Troubleshooting Manual ...
Страница 218: ......
Страница 268: ......
Страница 314: ......