Chapter 8
Replace the Septum
Maintaining a Purged Packed Column Injector
Maintenance and Troubleshooting Manual
133
OPERATING SEQUENCE
Replace the Septum
Materials needed
•
Non metallic sharp tool
•
Septum (see # 7, Table 8-1 on
)
•
Tweezers
WARNING! This operation must be carried out at low temperature to avoid burns. Therefore,
before beginning the sequence, the injector must be cooled to room temperature.
PRECAUTIONS
1. While in stand-by condition, press
OVEN
to
access the oven control table.
.
OVEN
Temp
80
80 <
Initial time
200
Ramp 1
Off
2. Scroll to
Temp
and press
OFF
.
3. Press
LEFT INLET
or
RIGHT INLET
depending on
which injector is operating. In the following
example, a PPKD injector installed on the right
channel is considered.
RIGHT INLET (PPKD)
Temp
200
200 <
Pressure
30
30
Mode:
Wide Bore
4. Scroll to
Temp
and press
OFF
.
Содержание TRACE GC Ultra
Страница 4: ......
Страница 10: ...x Maintenance and Troubleshooting Manual Contents ...
Страница 20: ......
Страница 128: ......
Страница 178: ...Chapter 9 Maintaining a PTV Injector PTV Troubleshooting 178 Maintenance and Troubleshooting Manual ...
Страница 218: ......
Страница 268: ......
Страница 314: ......