Chapter 1
Preventive Maintenance
Suggested Maintenance Schedule
22
Maintenance and Troubleshooting Manual
Suggested Maintenance Schedule
Preventive maintenance keeps your instruments running at peak performance.
The recommended maintenance schedule shown in Table 1-1 on page 23 is based
on a GC running multiple samples in an 8-hour day. You may need to adapt the
schedule to your situation depending on:
•
the number of analyses per day
•
how clean the samples are
•
the condition of the autosampler syringe needle
•
environmental conditions such as dirt and ambient temperature
Septa degrade over time. Different types will degrade at varying rates. Factors
affecting septa life include:
•
number of samples injected
•
injector temperature
•
condition of the syringe needle
Our recommendations for septa replacement are based on 200 injections in a
Thermo Fisher Scientific standard septum. Septa from other manufacturers may
show different rates of degradation.
Make sure you not only perform each scheduled item, but that you record it as
well, along with any observation about instrument performance. Your records and
notes can be invaluable when trying to trace a service problem.
In addition to the routine and preventive maintenance that you perform, we
recommend annual inspections by Thermo Fisher Scientific customer service
engineers.
These yearly checkups ensure that your instrument remains in peak condition.
Содержание TRACE GC Ultra
Страница 4: ......
Страница 10: ...x Maintenance and Troubleshooting Manual Contents ...
Страница 20: ......
Страница 128: ......
Страница 178: ...Chapter 9 Maintaining a PTV Injector PTV Troubleshooting 178 Maintenance and Troubleshooting Manual ...
Страница 218: ......
Страница 268: ......
Страница 314: ......