A13914AF
9-102
Maintenance
As-Needed/As-Required Maintenance
Figure 9.75
CC and MC Sample Probe
Figure 9.76
Reagent Probe A and B
Confirm Instrument Performance
When the probe installation is complete, run the controls to confirm proper instrument
performance. If the controls are out but there are no visible leaks, recalibrate all chemistries and
rerun controls.
1.
Sample Probe
2.
Collar Wash
3.
Waste Port
4.
Wash Port
5.
Probe tip is even to the bottom
edge of the wash port
1.
Reagent Probe
2.
Collar Wash
3.
Waste Port
4.
Wash Port
5.
Probe tip is even to the middle of
the wash port
A007375L.EPS
1
2
3
4
5
A007376L.EPS
1
2
3
4
5
Содержание UniCel DxC 600
Страница 4: ...A13914AF iv Revision History ...
Страница 26: ...A13914AF xxvi Safety Notice Documentation Symbols ...
Страница 36: ...A13914AF xxxvi Introduction How to Use this Manual ...
Страница 68: ...A13914AF 1 32 System Description Main Screen and Program Structure Figure 1 20 Program Structure QC Setup ...
Страница 71: ...A13914AF 1 35 System Description Main Screen and Program Structure 1 Figure 1 23 Program Structure Utils ...
Страница 132: ...A13914AF 3 34 System Setup Options Auto Generation of Control ...
Страница 190: ...A13914AF 5 26 Quality Control Review Archived Data ...
Страница 364: ...A13914AF 9 128 Maintenance As Needed As Required Maintenance ...
Страница 384: ...A13914AF 10 20 System Status and Commands Unload All ...
Страница 407: ......
Страница 490: ...A13914AF Glossary 10 Glossary ...
Страница 497: ......