A13914AF
9-97
Maintenance
As-Needed/As-Required Maintenance
9
15
Reinstall the ISE module cover.
16
Calibrate all ISE chemistries twice. Run controls to verify ISE performance.
IMPORTANT
By calibrating twice, all fluids are delivered to the flow cell in a standard manner and the
electrodes are stabilized more quickly.
Flush the Sample and Reagent Probe
The sample or reagent probes may need flushing when the probe becomes blocked or when
troubleshooting recommends flushing to clean the inside of the probe.
Materials Required:
•
Probe Cleaner Tubing Assembly (PN 756613)
•
Small cup for collecting wash solution
•
50 mL of 10% dilution of Wash Concentrate II solution per probe
CAUTION
To prevent damage due to electrical static discharge (ESD), wear a wrist ground
strap when you perform this procedure. For further instructions, refer to
in the beginning of this chapter.
1
Press the
STOP
button on the instrument to stop all motors.
2
Place a small cup under the collar wash of the probe to be flushed.
3
Unscrew the upper fitting (1) above the bead assembly to disconnect the DI water line. Do not
remove the level sense bead (2) otherwise alignments will be required.
Содержание UniCel DxC 600
Страница 4: ...A13914AF iv Revision History ...
Страница 26: ...A13914AF xxvi Safety Notice Documentation Symbols ...
Страница 36: ...A13914AF xxxvi Introduction How to Use this Manual ...
Страница 68: ...A13914AF 1 32 System Description Main Screen and Program Structure Figure 1 20 Program Structure QC Setup ...
Страница 71: ...A13914AF 1 35 System Description Main Screen and Program Structure 1 Figure 1 23 Program Structure Utils ...
Страница 132: ...A13914AF 3 34 System Setup Options Auto Generation of Control ...
Страница 190: ...A13914AF 5 26 Quality Control Review Archived Data ...
Страница 364: ...A13914AF 9 128 Maintenance As Needed As Required Maintenance ...
Страница 384: ...A13914AF 10 20 System Status and Commands Unload All ...
Страница 407: ......
Страница 490: ...A13914AF Glossary 10 Glossary ...
Страница 497: ......