A13914AF
9-22
Maintenance
Monthly Maintenance
•
Type
5
in the
Number of primes to repeat
field.
•
Select
Start Prime
. (Prime cycles are completed when
Standby
appears in the system status.)
4
Observe the fluid level during prime cycles. As the damper becomes half full, turn the damper
to the upright position.
5
Wipe dry any reagent spill on the damper assembly.
6
Clip the damper assembly back into the upright position.
CAUTION
Pinch hazard. Keep fingers clear of the ISE module as you lower it.
7
Lower the ISE module by releasing the locking pin. Be careful NOT to pinch tubing as the module
is lowered.
8
Reinstall the ISE module cover.
9
If the fluid level is above the MAX line:
Remove input line #30 (1) feeding into the damper.
•
Using a clean transfer pipette, remove excess reagent until damper is one-half full. Discard
the removed fluid.
•
Reconnect input line #30 to the damper, wipe dry any reagent spill on the damper top.
Figure 9.11
Содержание UniCel DxC 600
Страница 4: ...A13914AF iv Revision History ...
Страница 26: ...A13914AF xxvi Safety Notice Documentation Symbols ...
Страница 36: ...A13914AF xxxvi Introduction How to Use this Manual ...
Страница 68: ...A13914AF 1 32 System Description Main Screen and Program Structure Figure 1 20 Program Structure QC Setup ...
Страница 71: ...A13914AF 1 35 System Description Main Screen and Program Structure 1 Figure 1 23 Program Structure Utils ...
Страница 132: ...A13914AF 3 34 System Setup Options Auto Generation of Control ...
Страница 190: ...A13914AF 5 26 Quality Control Review Archived Data ...
Страница 364: ...A13914AF 9 128 Maintenance As Needed As Required Maintenance ...
Страница 384: ...A13914AF 10 20 System Status and Commands Unload All ...
Страница 407: ......
Страница 490: ...A13914AF Glossary 10 Glossary ...
Страница 497: ......