A13914AF
9-64
Maintenance
As-Needed/As-Required Maintenance
Introduction
As-Needed/As-Required Maintenance contains miscellaneous maintenance procedures which may
be performed on an as-needed basis or procedures that may be performed on a regular basis as
preventive service maintenance.
The As-Required Maintenance includes items that are maintained on an interval schedule, and are
normally performed as preventive service maintenance. The As-Required procedures are grouped
together with As-Needed Maintenance, categorized by subsystem instead of by interval.
Record any As-Needed or As-Required Maintenance on the Instrument Action Log section of E-
Maintenance (On-screen Electronic-Maintenance). Select
(
F1
)
to access the log on the
Maintenance
screen.
Action Log
The Maintenance Screen includes a free-text Action Log function that allows you to create notes
regarding maintenance issues and procedures. To display the Maintenance Action Log screen, select
the
Utils
icon, then select
2 Maintenance
, then
Action F1
. Use the Action Log to record any As-Needed
or As-Required maintenance you perform.
Replace the Chloride Electrode Tip
Prepare the CL electrode tip as follows prior to removal and installation:
1
Unpack a new chloride electrode tip (PN A10867). Carefully remove the knurled protective cap
from membrane end of tip assembly.
2
Perform the following ISE Service procedure.
ISE Service Procedure
The ISE service procedure prevents the flow cell from leaking reagent when an electrode is removed
from the instrument.
1
Loosen the two Phillips screws on the ISE module cover and remove the cover.
2
Release the locking pin on the ISE module and lift the module until it clicks into a raised, locked
position.
3
Proceed to Replacing the Chloride Electrode.
Содержание UniCel DxC 600
Страница 4: ...A13914AF iv Revision History ...
Страница 26: ...A13914AF xxvi Safety Notice Documentation Symbols ...
Страница 36: ...A13914AF xxxvi Introduction How to Use this Manual ...
Страница 68: ...A13914AF 1 32 System Description Main Screen and Program Structure Figure 1 20 Program Structure QC Setup ...
Страница 71: ...A13914AF 1 35 System Description Main Screen and Program Structure 1 Figure 1 23 Program Structure Utils ...
Страница 132: ...A13914AF 3 34 System Setup Options Auto Generation of Control ...
Страница 190: ...A13914AF 5 26 Quality Control Review Archived Data ...
Страница 364: ...A13914AF 9 128 Maintenance As Needed As Required Maintenance ...
Страница 384: ...A13914AF 10 20 System Status and Commands Unload All ...
Страница 407: ......
Страница 490: ...A13914AF Glossary 10 Glossary ...
Страница 497: ......