A13914AF
9-72
Maintenance
As-Needed/As-Required Maintenance
11
Install a new quad-ring (1) on the electrode.
Insert the sodium electrode into the flow cell. Insert retainer nut (2) and turn until finger-tight.
Figure 9.51
12
To test for proper seating of electrode, gently pull on electrode body. The electrode assembly
should not move. If the electrode moves, remove it and try to install it again. If installation is
difficult, check for an extra or missing quad-ring.
13
Reposition the flow cell on mounting panel and tighten the retaining screws.
14
Reconnect the electrode cable to the appropriate connector.
15
Select
OK
in the Maintenance pop-up confirmation window.
16
Select
Close
in the
Result
pop-up window. Proceed to Prime the Flow Cell.
Prime the Flow Cell
1
Prime the flow cell:
•
Select
Utils
from the menu bar,
•
Select
1 Prime
,
•
Select
MC F4
,
•
Prime
ISE ALL
.
Содержание UniCel DxC 600
Страница 4: ...A13914AF iv Revision History ...
Страница 26: ...A13914AF xxvi Safety Notice Documentation Symbols ...
Страница 36: ...A13914AF xxxvi Introduction How to Use this Manual ...
Страница 68: ...A13914AF 1 32 System Description Main Screen and Program Structure Figure 1 20 Program Structure QC Setup ...
Страница 71: ...A13914AF 1 35 System Description Main Screen and Program Structure 1 Figure 1 23 Program Structure Utils ...
Страница 132: ...A13914AF 3 34 System Setup Options Auto Generation of Control ...
Страница 190: ...A13914AF 5 26 Quality Control Review Archived Data ...
Страница 364: ...A13914AF 9 128 Maintenance As Needed As Required Maintenance ...
Страница 384: ...A13914AF 10 20 System Status and Commands Unload All ...
Страница 407: ......
Страница 490: ...A13914AF Glossary 10 Glossary ...
Страница 497: ......