A13914AF
9-63
Maintenance
As-Needed/As-Required Maintenance
9
13
Select
Cancel
to return to the Maintenance menu.
14
Reinstall the MC module and ISE module covers.
15
Proceed to the
in the Monthly Maintenance section of this chapter
As-Needed/As-Required Maintenance
Replace the Chloride Electrode Tip
Replace the Sodium Measure/Reference Electrode
Clean the CO2 Alkaline Buffer Lines
Clean the ISE Flow Cell Using Clenz Solution
Flush the Sample and Reagent Probe
Replace the Sample and Reagent Probe
Clean the CC Sample Probe, Reagent Probes and Mixers
Clean the MC Sample Crane and Collar Assembly
Clean the Precipitate in PHOSm (DxC 800 Only)
Inspect the Cuvette Washer Probe
Wash All Cuvettes With System Wash
Wash the CC Reagent Cuvettes with CCWA
Содержание UniCel DxC 600
Страница 4: ...A13914AF iv Revision History ...
Страница 26: ...A13914AF xxvi Safety Notice Documentation Symbols ...
Страница 36: ...A13914AF xxxvi Introduction How to Use this Manual ...
Страница 68: ...A13914AF 1 32 System Description Main Screen and Program Structure Figure 1 20 Program Structure QC Setup ...
Страница 71: ...A13914AF 1 35 System Description Main Screen and Program Structure 1 Figure 1 23 Program Structure Utils ...
Страница 132: ...A13914AF 3 34 System Setup Options Auto Generation of Control ...
Страница 190: ...A13914AF 5 26 Quality Control Review Archived Data ...
Страница 364: ...A13914AF 9 128 Maintenance As Needed As Required Maintenance ...
Страница 384: ...A13914AF 10 20 System Status and Commands Unload All ...
Страница 407: ......
Страница 490: ...A13914AF Glossary 10 Glossary ...
Страница 497: ......