A13914AF
9-76
Maintenance
As-Needed/As-Required Maintenance
Prepare the New CO
2
Measuring Electrode Membrane
1
Use tweezers to remove a new membrane (PN 661750) from the package in the Maintenance Kit.
Rinse the membrane thoroughly, on both sides, with deionized water. Gently dry the membrane
with lintless tissue.
Use the packaged membranes that are separated by pink spacers.
Figure 9.55
2
Place the membrane clamp (2) on a flat surface. Using tweezers, carefully center the membrane
(1) on top of the membrane clamp.
Figure 9.56
Содержание UniCel DxC 600
Страница 4: ...A13914AF iv Revision History ...
Страница 26: ...A13914AF xxvi Safety Notice Documentation Symbols ...
Страница 36: ...A13914AF xxxvi Introduction How to Use this Manual ...
Страница 68: ...A13914AF 1 32 System Description Main Screen and Program Structure Figure 1 20 Program Structure QC Setup ...
Страница 71: ...A13914AF 1 35 System Description Main Screen and Program Structure 1 Figure 1 23 Program Structure Utils ...
Страница 132: ...A13914AF 3 34 System Setup Options Auto Generation of Control ...
Страница 190: ...A13914AF 5 26 Quality Control Review Archived Data ...
Страница 364: ...A13914AF 9 128 Maintenance As Needed As Required Maintenance ...
Страница 384: ...A13914AF 10 20 System Status and Commands Unload All ...
Страница 407: ......
Страница 490: ...A13914AF Glossary 10 Glossary ...
Страница 497: ......