A13914AF
9-83
Maintenance
As-Needed/As-Required Maintenance
9
8
Hold the removed EIC over a sink or absorbent tissue. Using a 20 or 30 mL irrigation syringe
filled with 10% bleach solution, insert the tip of the syringe into the valve port opening (1).
Figure 9.65
9
Flush the 10% bleach solution through the valve port. This flushes the sample inject area. Allow
the bleach solution to sit for one minute.
The one-minute waiting period applies only to the 10% bleach solution, and not to the following
deionized water or 70% isopropyl alcohol.
10
Repeat the flushing procedure through the valve port using deionized water.
11
Repeat the flushing procedure through the valve port using 70% isopropyl alcohol.
12
Repeat the flushing procedure through the valve port using deionized water.
Содержание UniCel DxC 600
Страница 4: ...A13914AF iv Revision History ...
Страница 26: ...A13914AF xxvi Safety Notice Documentation Symbols ...
Страница 36: ...A13914AF xxxvi Introduction How to Use this Manual ...
Страница 68: ...A13914AF 1 32 System Description Main Screen and Program Structure Figure 1 20 Program Structure QC Setup ...
Страница 71: ...A13914AF 1 35 System Description Main Screen and Program Structure 1 Figure 1 23 Program Structure Utils ...
Страница 132: ...A13914AF 3 34 System Setup Options Auto Generation of Control ...
Страница 190: ...A13914AF 5 26 Quality Control Review Archived Data ...
Страница 364: ...A13914AF 9 128 Maintenance As Needed As Required Maintenance ...
Страница 384: ...A13914AF 10 20 System Status and Commands Unload All ...
Страница 407: ......
Страница 490: ...A13914AF Glossary 10 Glossary ...
Страница 497: ......