Chapter 6 - Functional Checklist
_______________________________________________________________________________________________________________
MNL000300.doc
Revision 1
09/16/2016
SourceSystem TE11
© Versum Materials, Inc. as of the revision and date shown. All rights reserved.
Confidential and Proprietary Data
Page
6
-
8
VERSUM MATERIALS, INC. TE11 SOURCE SYSTEM FIELD START‐UP CHECKLIST
page 4 of 9
CONTROLLER
Left side or single
Right side
Seat all cable connections and verify mounting of
components on DIN rails.
E‐stop guard in place
Remove pneumatic bulkheads from the back of the controller.
Do all valves operate
Manual mode operation
No audible solenoid leaks
Re‐install pneumatic bulkheads from the back of the controller.
Firmware Versions:
PLC
HMI
Network
Configuration File Rev.
External Shutdown wired
Supervisory circuit utilized
Correct program loaded / version
Program name and date
Life safety system utilized ( yes / no )
Verify device addressing indicated on the controller
Source system name
Profibus Address
IP Address (Ethernet Only)
IP subnet Mask (Ethernet Only)
Default Gateway (Ethernet Only)
Source system communicating with network
Controller door adjustment
Z‐purge set @
≧
0.1" H20 (24.9 Pa)
SECTION COMPLETED SIGNATURE
DATE