Chapter 3 - Tubing Connections
_______________________________________________________________________________________________________________
MNL000297.doc
Revision 2
09/16/2016
Source System TE11
© Versum Materials, Inc. as of the revision and date shown. All rights reserved.
Confidential and Proprietary Data
Page
3
-
5
Note: The method of monitoring the outer secondary containment for leaks may be dictated by local
codes, such as the Toxic Gas Ordinance
.
For coax tubing on Silane lines, the
pressure decay method with an inert gas
(not air) must be used.