13-4
Testing And Maintenance
BE1-CDS220
Figure 13-1. BE1-CDS, Rear View, Terminal Connections
Power Up
Purpose: To verify that the relay performs the power-up sequence.
Step 1. Apply voltage to input power terminals A2 and A3. Table 13-1 shows the appropriate voltage
for each relay style.
Table 13-1. Voltage Input
Style Number
Voltage Input
BE1-CDS2 2 0 - x x x x x x L x x x x x 24
Vdc
BE1-CDS2 2 0 - x x x x x x Y x x x x x 48/125 Vac/dc
BE1-CDS2 2 0 - x x x x x x Z x x x x x
125/250 Vac/dc
Step 2. Verify that the Power LED is ON, and that characters are displayed on the HMI display (if
option Y - 6 pushbutton HMI with LCD display is selected). Upon power-up, the relay will
perform a brief self test.
During this brief test, all front panel LEDs will flash momentarily, the display will indicate each
step of the self test, relay model, software version and then settle into the default display
screen. Contact Basler Electric, Customer Service if anything appears out of the ordinary or if
the LCD code error messages appear.
Communications
Purpose: To verify that the BE1-CDS relay communicates through all ports.
Reference Commands: ACCESS, EXIT
To communicate with the BE1-CDS220 through any of the three ports, you may use either a VT-100
terminal or a personal computer (PC) with a serial port and suitable communications software. The relay
communication default settings are:
•
Baud Rate = 9600 bps
•
Data Bits = 8
•
Stop Bit =1
•
Parity = None
•
Flow Control = Xon/Xoff.
Please see appendix D for more information on Terminal and HyperTerminal setups for Windows
3.1,
Windows
95, and Windows
98.
Summary of Contents for BE1-CDS220
Page 2: ......
Page 10: ...viii Introduction BE1 CDS220 This page intentionally left blank...
Page 36: ...ii Quick Start BE1 CDS220 This page intentionally left blank...
Page 48: ...ii Input And Output Functions BE1 CDS220 This page intentionally left blank...
Page 66: ...iv Protection and Control BE1 CDS220 This page intentionally left blank...
Page 112: ...ii Metering BE1 CDS220 This page intentionally left blank...
Page 116: ...5 4 Metering BE1 CDS220 This page intentionally left blank...
Page 166: ...ii BESTlogic Programmable Logic BE1 CDS220 This page intentionally left blank...
Page 176: ...7 10 BESTlogic Programmable Logic BE1 CDS220 This page intentionally left blank...
Page 234: ...8 56 Application BE1 CDS220 This page intentionally left blank...
Page 236: ...ii Security BE1 CDS220 This page intentionally left blank...
Page 240: ...9 4 Security BE1 CDS220 This page intentionally left blank...
Page 242: ...ii Human Machine Interface BE1 CDS220 This page intentionally left blank...
Page 256: ...10 14 Human Machine Interface BE1 CDS220 This page intentionally left blank...
Page 258: ...ii ASCII Command Interface BE1 CDS220 This page intentionally left blank...
Page 422: ...14 32 BESTCOMS Software BE1 CDS220 This page intentionally left blank...
Page 424: ...ii Time Current Characteristics BE1 CDS220 This page intentionally left blank...
Page 452: ...ii Terminal Communication BE1 CDS220 This page intentionally left blank...
Page 456: ...C 4 Terminal Communication BE1 CDS220 This page intentionally left blank...
Page 458: ...ii Settings Calculations BE1 CDS220 This page intentionally left blank...
Page 475: ......