![Abbott CELL-DYN 3200 System Operator'S Manual Download Page 82](http://html1.mh-extra.com/html/abbott/cell-dyn-3200/cell-dyn-3200_system-operators-manual_450985082.webp)
2-6
CELL-DYN
®
3200 System Operator’s Manual
9140181H—October 2001
Installation Procedures and Special Requirements
Tubing Installation
Section 2
Figure 2.1 Reagent Inlet Panel
7. Locate the
Waste-Full Sensor
Plug attached to the cap's electrode wires.
Insert the plug into the
:DVWH6HQVRU
connector located on the Reagent Inlet
Panel. Attach the ground shield on the cable to the connection on the rear
panel.
If the waste tube is placed directly into a drain, insert the Dummy Plug
(provided in the Accessory kit) into the Waste Sensor Connector, as the
EXTERNAL WASTE FULL
alert will activate if no plug is inserted. For
information on ordering a Waste Dummy Plug, refer to
Appendix B
¥
Parts
and Accessories
.
Normally Closed Valves
To gain access to all six Normally Closed Valves on the Flow Panel, open both the
Left and Right Front Covers and remove the Tower Cover. Remove the Front Skirt
(CS model) or move the Sample Loader (SL model) away from the instrument.
(Refer to instructions later in this section for opening and removing these
components.)
Before shipment, the tubing is removed from these valves. To ensure correct
system operation, the tubing must be completely inserted in all the valves before
the instrument power is turned ON. Follow the directions below to open the front
covers and remove the Skirt or Sample Loader to allow access to all the Normally
Closed Valves. Refer to Figure 2.2.
1 Waste Full Sensor
2 Waste Outlet
Connector
3 HGB Lyse Connector
4 Diluent/Sheath
Connector
5 WBC Lyse Connector
1
2
3
4
5