737 MAX Flight Crew Operations Manual
Normal Procedures -
Amplified Procedures
MN-FLT-OH-201
NP.21.6
• The tires are not too worn, not damaged and there is no tread
separation;
• The gear struts are not fully compressed; The engine inlets and
tailpipes are clear, the access panels are secured, the exterior
including the bottom of the nacelles, is not damaged and the
reversers are stowed;
• The doors and access panels that are not in use are latched;
• The probes, vents, and static ports are cleared and not damaged;
• The skin area adjacent to the pitot probes and static ports is not
wrinkled;
• The antennas are not damaged;
• The light lenses are clean and not damaged.
For cold weather operations see the Supplementary Procedures.
Note:
fluid leaks from the engine drains are allowed provided the
leaks are less than a continuous stream. Refer to the Engine
Start Procedure for additional guidance.
Left Forward Fuselage
Probes, sensors, ports, vents and drains (as applicable) .......... Check
Doors and access panels (not in use) .....................................Latched
Nose
Radome .................................................................................... Check
Conductor straps ......................................................................Secure
Forward EE door ......................................................................Secure
Nose Wheel Well
Tires and wheels ....................................................................... Check
Exterior light ............................................................................ Check
Gear strut and doors ................................................................. Check
Nose wheel steering assembly ................................................. Check
Nose gear steering lockout pin ...........................................As needed
Gear pin ..............................................................................As needed
Nose wheel spin brake (snubber) ...........................................In place
Right forward fuselage
Probes, sensors, ports, vents and drains (as applicable) .......... Check
March 1, 2021