737 MAX Flight Crew Operations Manual
Normal Procedures -
Amplified Procedures
MN-FLT-OH-201
NP.21.60
After Takeoff Procedure
The After-Take off phase is one of the last opportunities to properly
configure Air Conditioning and Pressurization System. Do the after takeoff
checklist meticulously.
Threat and errors associated with this phase of flight are:
• Terrain;
• Weather;
• Traffic;
• Pressurization System switches;
These items are not limited to and pilots are expected to anticipate any
threat.
Pilot Flying
Pilot Monitoring
After the Flaps are UP
Call “After Take Off checklist”
ENGINE BLEEDS – ON
PACKS - AUTO
ISOLATION VALVE – AUTO
APU – OFF
All items of the after takeoff checklist
must be verified by the PF.
Engine Start Switches – As required
In accordance with the PF
Landing gear – Up & Off
Auto Brake – OFF
Flaps – Up No Lights
-MAX 8 EB1 fleet
RUNWAY INHIBIT - INHIBIT
Do (read aloud) the requested checklist
and inform “After takeoff checklist
completed”.
-700 and -800 Fleets Only
If there is no altitude restriction call:
“Set Full Rated Climb Thrust”
“Climb Thrust Set”
Fasten belts switch - as needed (ON or AUTO)
March 1, 2021