Rostock MAX v2 Assembly Guide
Installing the Belt Clamps...................................................................................................131
Adjusting the Belt Tension..................................................................................................133
Assembling the EZStruder..................................................................................................136
Installing & Mounting the EZStruder.................................................................................140
Wiring the EZStruder Stepper Motor..................................................................................146
Preparing the Hot End Wiring.............................................................................................149
Wiring the Hot End.............................................................................................................152
Attaching the Hot End to the Hot End Mounting Plate.......................................................155
Installing the Bowden Tube.................................................................................................157
Assembling the Effector Platform.......................................................................................159
Installing the Delta Arms.....................................................................................................161
Attaching the Effector Platform..........................................................................................164
13 – Installing the Hot End....................................................................................................................166
14 – Finishing the Top End....................................................................................................................168
Installing the Spool Holder.................................................................................................168
Installing the Top Plate and Spool Support Arm.................................................................172
Assembling the Front Panel................................................................................................176
Installing the LCD Trim Panels...........................................................................................179
Preparing the RAMBo Mounting Plate...............................................................................182
Mounting the RAMBo Controller.......................................................................................184
Wire Prep: End Stops..........................................................................................................186
Wire Prep: The Hot End Thermistor Connector..................................................................188
Wire Prep: The Heated End Thermistor Connector............................................................189
Wire Prep: Extruder Motor Connector................................................................................190
Wiring the RAMBo Controller – Terminal Block...............................................................191
Plugging cabling into the RAMBo......................................................................................193
Installing the RAMBo Into The Machine Base...................................................................196
Installing the Power Switch and LCD Controller Cables...................................................197
Attaching the Base Covers & LCD Panel...........................................................................200
Attaching the Power and USB Cables.................................................................................203
Installing the Acrylic Cover Panels.....................................................................................205
Dem Feet!............................................................................................................................207
Installing the Borosilicate Glass Build Plate.......................................................................208
Smoke Test!.........................................................................................................................210
Installing the RAMBo Driver..............................................................................................211
Installing the Arduino IDE..................................................................................................213
Configuring the Arduino IDE..............................................................................................214
Test Upload.........................................................................................................................215
4
Содержание Rostock MAX v2
Страница 25: ...Rostock MAX v2 Assembly Guide Melamine Parts Sheet 1 25 ...
Страница 26: ...Rostock MAX v2 Assembly Guide Melamine Parts Sheet 2 Melamine Parts Sheet 3 26 ...
Страница 27: ...Rostock MAX v2 Assembly Guide Melamine Parts Sheet 4 27 ...
Страница 171: ...Rostock MAX v2 Assembly Guide 171 Fig 14 8 Spool holder support installed ...