Rostock MAX v2 Assembly Guide
Installing the Delta Arms
For this task, you'll need the following components:
Before installing the delta arms, clean the mold flashing from the inner and outer faces of the
arm tips that will come in contact with the u-joints. You can do this easily with an X-Acto knife.
After you've got the mold flashing removed from the ends of the delta arms, install one u-joint
into the end of each delta arm. Do this for all six delta arms.
161
Fig. 12-4: Mold flashing.
Fig. 12-5: Cleaned off.
Fig. 12-6: U-Joint installed.
Fig. 12-7: Ready to go!
Содержание Rostock MAX v2
Страница 25: ...Rostock MAX v2 Assembly Guide Melamine Parts Sheet 1 25 ...
Страница 26: ...Rostock MAX v2 Assembly Guide Melamine Parts Sheet 2 Melamine Parts Sheet 3 26 ...
Страница 27: ...Rostock MAX v2 Assembly Guide Melamine Parts Sheet 4 27 ...
Страница 171: ...Rostock MAX v2 Assembly Guide 171 Fig 14 8 Spool holder support installed ...