Rostock MAX v2 Assembly Guide
Tightening the Towers
Part of the this process involves making sure that the towers are square to the heated bed. You'll
need your small framing square for this task. Before you start, make sure the machine is sitting flat on
the table with no wires under the feet, etc.
The first thing to remember about this process is to make sure that the tower is in contact with
the depth stop screw BEFORE you begin to tighten down each tower (bottom & top). If you don't, the
top of the machine won't be level and that will make calibrating the printer very, very difficult.
Grab your trusty 12” framing square and a clamp and set them up as shown below. I started off
with the X axis tower.
113
Fig. 7-50: Preparing to square the first tower.
Содержание Rostock MAX v2
Страница 25: ...Rostock MAX v2 Assembly Guide Melamine Parts Sheet 1 25 ...
Страница 26: ...Rostock MAX v2 Assembly Guide Melamine Parts Sheet 2 Melamine Parts Sheet 3 26 ...
Страница 27: ...Rostock MAX v2 Assembly Guide Melamine Parts Sheet 4 27 ...
Страница 171: ...Rostock MAX v2 Assembly Guide 171 Fig 14 8 Spool holder support installed ...