Rostock MAX v2 Assembly Guide
Using a hair dryer or heat gun, heat the
tubing until it conforms to the loom & wires as
shown in Fig. 13-5. Keep the heat source
moving around the tubing as it shrinks to get an
even shrink all the way around.
Slide the other length of heat-shrink tubing up the loom to the top and shrink it.
Now it's time to prepare the hot end for wiring. By this time, the RTV in your hot end should be
fully cured (make sure you've let it cure for at least 24 hours) and it should look like this:
150
Fig. 11-3: Positioning the heat shrink.
Fig. 11-4: Heat-shrink applied.
Fig. 11-5: Ready to go!
Содержание Rostock MAX v2
Страница 25: ...Rostock MAX v2 Assembly Guide Melamine Parts Sheet 1 25 ...
Страница 26: ...Rostock MAX v2 Assembly Guide Melamine Parts Sheet 2 Melamine Parts Sheet 3 26 ...
Страница 27: ...Rostock MAX v2 Assembly Guide Melamine Parts Sheet 4 27 ...
Страница 171: ...Rostock MAX v2 Assembly Guide 171 Fig 14 8 Spool holder support installed ...