NOTE:
In
select “Port #2 OP2G5 #2” as
Working Port
and “Port #2 OP2G5
#1” as
Protection Port
.
Creating cross-connections
Proceed as follows to create the required cross-connections:
.................................................................................................................................................................................................
1
In the
WaveStar
®
CIT
System View
of NE-A, select
Configuration
→
Cross-Connection
→
Create
to set up a cross-connection.
Result:
The
Create New Cross Connection
window appears.
.................................................................................................................................................................................................
2
Select/Activate the
Signal Rate Auto Set
check box and define the cross-connection
rate in the
Rate
drop-down list box according to the analyzer signal used. The
following values are possible:
•
VC-3
(SDH) /
STS-1
(SONET)
•
VC-4
(SDH) /
STS-3
(SONET)
•
VC-4-4c
(SDH) /
STS-12
(SONET)
•
VC-4-16c
(SDH) /
STS-48
(SONET)
•
VC-4-64c
(SDH) /
STS-192
(SONET)
Please note that it is not possible to proceed to the next window before selecting the
cross-connection rate.
.................................................................................................................................................................................................
3
In the
XC Application
group box, select
2-Way Point-to-Point
.
.................................................................................................................................................................................................
4
Click the left
Select
button to select the source tributary.
Result:
The
Ptn Grp
selection tab appears.
.................................................................................................................................................................................................
5
Select the port to which the analyzer is connected (port #3 OP2G5 #1).
Result:
In the
Tributary
list box on the right, the AIDs of all STSs belonging to
the respective port are displayed.
.................................................................................................................................................................................................
6
Select the STS which shall be used as the source and click the
Select
button.
Network establishment and testing
1+1 MSP/APS test setup
.................................................................................................................................................................................................................................
365-374-187
Issue 1, December 2005
Lucent Technologies - Proprietary
See notice on first page
10-27
E
N D
O F
S
T E P S
.................................................................................................................................................................................................