
Part II: NE provisioning and stand-alone
installation test
Overview
.................................................................................................................................................................................................................................
Purpose
This part of the
LambdaUnite
®
MSS Installation Guide contains the NE provisioning
and the stand-alone test procedures.
Contents
This part of the document contains the following chapters:
•
Chapter 7,
NE provisioning
•
Chapter 8,
Stand-alone test procedures
•
Chapter 9,
Exit checklist – Part II
Entry checklist
The following provides a checklist to be completed prior to performing the NE
provisioning and stand-alone installation tests. Verify that each procedure has been
completed. Check off and initial the item.
Procedure
Completed
Initials
Notes
Have all procedures been completed which
are required in chapter 6,
power installation exit checklist” (p. 6-2)
Is a CAT5 crossover LAN cable with
RJ-45/RJ-45 connectors available (see
chapter 4,
.................................................................................................................................................................................................................................
365-374-187
Issue 1, December 2005
Lucent Technologies - Proprietary
See notice on first page
II-1