
Line timing test setup
.................................................................................................................................................................................................................................
Overview
This section provides the information needed to set up the line timing test (see section
Safety
CAUTION
ESD hazard
Electronic components can be destroyed by electrostatic discharge.
Always observe the ESD instructions (cf.
“Electrostatic discharge” (p. 1-20)
Required equipment
Prior to performing this task, the following equipment must be available:
1.
WaveStar
®
CIT PC
2. CAT5 crossover LAN cable with RJ-45/RJ-45 connectors (see chapter 4,
4-48, “CIT connection (LAN crossed)” (p. 4-74)
3. ESD Wrist Strap.
Prerequisites
Prior to performing this task, you must have done the following:
1. Configured the DCC channels of all used optical ports correctly (see section
2. Selected the correct synchronization system mode (SDH or SONET) (see chapter 7,
section
3. Logged in to
WaveStar
®
CIT as Super User (see chapter 5, section
) if
WaveStar
®
CIT User Login has been
enabled during
WaveStar
®
CIT installation.
4. Connected two external clocks with 2-MHz or 2 Mbit/s (SDH) or DS1 (SONET)
signals to NE-A.
Network establishment and testing
.................................................................................................................................................................................................................................
10-18
Lucent Technologies - Proprietary
See notice on first page
365-374-187
Issue 1, December 2005