
NE provisioning and stand-alone installation test exit checklist
.................................................................................................................................................................................................................................
Verify that all procedures described below have been completed. If a procedure was
not applicable, indicate “N/A”.
Procedure
Result
(Passed/Completed, or
N/A)
Initials
Notes
NE login performed
NE name (TID) provisioned
System parameters provisioned
NE LAN port for TCP/IP access
configured
NE date and time provisioned
Password aging prevented
External timing input ports
provisioned
External timing references
provisioned
System timing provisioned
LED test performed
Alarm reporting test performed
NE synchronization test
performed
Optical power meter test
performed
Receiver sensitivity test
performed
DS3 transmission test performed
Port and cross-connect test
performed
XC protection test performed
CTL protection test performed
Exit checklist – Part II
.................................................................................................................................................................................................................................
9-2
Lucent Technologies - Proprietary
See notice on first page
365-374-187
Issue 1, December 2005