
DCC provisioning for SCN
.................................................................................................................................................................................................................................
Purpose
This section provides a procedure for creating new DCC terminations for SCN and
enabling the ONNS auto-discovery function.
Required equipment
Prior to performing this task, the following equipment must be available:
1.
WaveStar
®
CIT PC
2. CAT5 crossover LAN cable with RJ-45/RJ-45 connectors (see chapter 4,
4-48, “CIT connection (LAN crossed)” (p. 4-74)
Prerequisites
Prior to performing this task, you must be logged in to
WaveStar
®
CIT as Super User
(see chapter 5, section
) if
WaveStar
®
CIT User Login has been enabled during
WaveStar
®
CIT installation.
Procedure
Proceed as follows to create new DCC terminations:
.................................................................................................................................................................................................
1
Log in to NE-A as described in chapter 7, section
.................................................................................................................................................................................................
2
In the
WaveStar
®
CIT
System View
, select
Configuration
→
DCC Terminations...
.
Result:
The
Configure DCC Terminations
window appears. The
Equip
selection
tab appears on the left side of the window.
.................................................................................................................................................................................................
3
Select one of the circuit packs that interconnect the ONNS NEs and click
Select
.
.................................................................................................................................................................................................
4
Select
New Termination
in the parameter part (
Section DCC
or
Line DCC
tab).
.................................................................................................................................................................................................
5
Click
Select port for new DCC termination...
and select one optical interface port that
interconnects the ONNS NEs.
Important!
To be able to set up a new DCC termination for an SCN the selected
port must have the port class
iNNI
.
Network establishment and testing
.................................................................................................................................................................................................................................
365-374-187
Issue 1, December 2005
Lucent Technologies - Proprietary
See notice on first page
10-85