Procedure
Completed
Initials
Notes
Is the selected installation site accessible
for delivery of racks?
If on a different level than receiving dock,
is the elevator large enough?
Does the available floor space fulfil the
requirements given in chapter 2, section
Does the floor support a weight of greater
than 210 kg [463 lbs]?
Are the climatic conditions fulfilled as
described in chapter 1, section
Is there enough space in the cable rack or
under the floor to coil/loop excess length
of transmission cables?
Is there enough space in the cable rack or
under the floor for power and other
external cables?
Are there any obstacles that will affect the
physical installation or cabling?
Are the required fuse/breaker positions
available?
Are the needed
LambdaUnite
®
MSS racks
available (ETSI-2 or NEBS-2000)?
Are the needed
LambdaUnite
®
MSS
subracks available?
Are all needed
LambdaUnite
®
MSS circuit
packs and cables available?
Is an ESD wrist strap available?
Are
metric
tools available?
Is a multimeter available?
Is an ohmmeter available?
Is an external timing source available?