10.1
10 - 9
4. Shortly after turning on the light source lamp, the
reference signal fluctuates due to a change in the
lamp energy.
The lamp requires a warm-up period of about 10
minutes after turning it on. Measurement should
be started after the reference signal has stabilized.
5. In a measurement immediately after a cuvette is
mounted, the reference signal may not stabilize
due to contamination of the cuvette.
After mounting a cuvette, carry out heating at the
highest temperature a few times.
The Temp. Program Development function should
be executed after stabilization of the reference
signal.
Detection Start
Enter the REF absorbance for detection of background
absorption.
Usually, the default value should be used.
Input range: 0.0001 to 1.0000 Abs
Detection End
Enter the REF absorbance at which it is judged that
background absorption ended after it had been detected.
Usually, the default value should be used.
Input range: 0.0001 to 1.0000 Abs
Dry addition
This function is provided for adding one more drying stage
under the determined conditions after a drying test and then
executing the temperature program.
When you apply check mark to the “Dry addition” check box
by clicking it, stage 2 (drying) will be implemented under the
input conditions.
Содержание ZA3000 Series
Страница 267: ...3 1 11 3 43 Fig 3 31 Parameter List Window Common conditions The setting of method is thus completed ...
Страница 357: ...5 5 Twin Injection 5 28 Fig 5 24 Dialog Box for Confirming Nozzle Position 7 Click Start measurement ...
Страница 423: ...9 3 5 9 11 Fig 9 14 Diagnosis Log Dialog Box ...
Страница 449: ...10 5 Reflecting on Analysis Conditions 10 24 Fig 10 16 Method Window Unmark the checkbox ...
Страница 455: ...INDEX 4 V Verify 3 34 W Working curve graph 4 1 Wavelength accuracy 9 1 ...
Страница 456: ...INSTRUCTION MANUAL 7J1 9027 000 Ver 1 February 2016 MODEL HFS 4 HYDRIDE FORMATION SYSTEM ...